Skip to main content

New London development installs EV chargers

Exemplar, the developer of Fitzroy Place, one of London’s most high-profile and successful new mixed-use developments, has appointed Swarco company Evolt to supply and install 38 single outlet AC wall mount electric vehicle (EV) charge points.
September 9, 2016 Read time: 1 min

Exemplar, the developer of Fitzroy Place, one of London’s most high-profile and successful new mixed-use developments, has appointed 129 Swarco company Evolt to supply and install 38 single outlet AC wall mount electric vehicle (EV) charge points.

Evolt will also install the latest load distribution technology, which ensures the total power to all charge points is consistently available, evenly distributed and prevents overloading. When an EV is fully charged, its power usage is re-distributed to the other EVs so that they can achieve a full charge in the fastest possible time.

The charge points are split into four groups, with each group being controlled by a distribution board. They are also connected to a centralised server, which manages the entire system and provides a real-time reporting function for operators. The server also has a failsafe mechanism in case of a local power outage, where it ‘instructs’ the distribution boards to continue charging vehicles at a default setting.

Related Content

  • May 11, 2020
    AVs and poor weather – a bad mix
    The US DoT has produced a report on how adverse weather and road conditions will affect automated vehicles – it found inconsistency between different cars with these features which are already on highways and suggests limitations are not yet understood
  • February 1, 2012
    Free-flow upgrade to Holland's Westerschelde tunnel's toll system
    Unbroken service Technolution's Winifred Roggekamp and Dave Marples describe efforts to upgrade the Westerscheldetunnel's tolling system to give free-flow capability. Until 2003 the Flanders region of Zeeland, in the south-west of the Netherlands, was connected to the mainland only by ferry. The new Westerscheldetunnel, a 6.6km toll tunnel, improves communications with the region considerably, taking some 100km off the alternative road journey. In 2006 it was recognised that the toll plaza for the tunnel ne
  • March 1, 2013
    HeERO - harmonising e-Call across Europe
    The second stage of the EC’s HeERO project, which aims to address some of the issues surrounding the eCall system, has just got underway. Jason Barnes reports. As the European Commission (EC)’s Har­monised eCall European Pilot (HeERO) project progresses into its second stage, ‘HeERO 2’, significant progress has already been made in addressing the technological and institutional issues relating to the pan-European deployment of an eCall system based around the new ‘112’ universal emergency telephone number.
  • June 24, 2016
    Elimination of electric vehicle systems
    According to IDTechEx Research reports, Power Electronics for Electric Vehicles 2016-2026, Mild Hybrid 48V Vehicles 2016-2031 and Structural Electronics 2015-2025: Applications, Technologies, Forecasts”, el4ctric vehicles (EVs)have a cost challenge: hybrids have complexity problems meaning reliability and space issues. Extra power electronic units arrive for tasks such as a vehicle-to-grid, vehicle-to-house and inductive charging. Many more will be added in future such as regeneration modules - thermoelect