Skip to main content

Michael Baker to provide construction services for Pennsylvania road upgrade project

In cooperation with the Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65). PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. As part of the c
December 21, 2016 Read time: 1 min
In cooperation with the 6111 Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65).

PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. 
 
As part of the contract, Michael Baker’s experts in construction management and inspection will ensure timely, efficient and safe delivery for the realignment and full reconstruction for portions of a three-mile stretch of Freedom Road, travelled by 4,567 commuters a day.  The improvements will include structure replacement, significant stream relocation, drainage upgrades, guide rail installations, signage and pavement markings, traffic signal upgrades and the addition of a turning lane at SR 65. 

Related Content

  • May 23, 2017
    Michigan Department of Transportation partners with 3M on connected work zone
    The Michigan Department of Transportation (MDOT) is partnering with 3M to utilise connected vehicle technologies along more than three miles of I-75. Using solutions from 3M, the current I-75 work zone in Oakland County will be transformed over the course of four months to improve safety for drivers and to test advanced vehicle to infrastructure technologies on the connected and autonomous vehicles of the future.
  • May 11, 2012
    Funding shortfall for US Interstate upgrades
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str
  • June 1, 2015
    Fluor JV to build Texas expressway
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • November 15, 2018
    McCain VMS for PennDoT I-76 smart corridor near Philadelphia
    McCain’s variable speed limit signs have been chosen for the new Interstate 76 (Schuylkill Expressway) smart corridor initiatives. The Swarco Group subsidiary says the deal with Pennsylvania Department of Transportation (PennDoT) is one of its largest variable messaging signs (VMS) deployments on the US east coast. McCain distributor M.H. Corbin has been awarded the contract for 76 signs to be installed over the next year along nearly 50 miles of the I-76 between King of Prussia and Philadelphia – a majo