Skip to main content

Luton to Dunstable guided busway opens

Following many years of planning, the Luton and Dunstable guided busway is now open to the public. The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.
September 25, 2013 Read time: 2 mins
Following many years of planning, the Luton and Dunstable guided busway is now open to the public.  The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.

A 7.5 kilometre section of the busway is ‘guided’, using the disused Luton-Dunstable railway corridor, through which buses will use a fixed corridor formed from six metre long precast concrete beams. This allows standard buses, fitted with two small guide wheels, to join and leave the track, and travel on it in both directions smoothly and safely at speeds of up to 50 miles per hour.

Designed and built for Luton Borough Council and Central Bedfordshire Council by a joint venture comprising 4983 Parsons Brinckerhoff, Arup and Bam Nuttall, the innovative transportation project will relieve traffic congestion in the region through the provision of a dedicated route for public transport.

The work included the construction of seven new bridges and refurbishment/reconstruction of three bridges along the route, the construction of four new high specification bus stops and a major bus interchange at Luton railway station - resulting in links to Luton town centre, the railway network and providing easy access to Luton airport.

For more information on companies in this article

Related Content

  • Consortium lands Mexico highway concession
    October 1, 2014
    A consortium led by Mota-Engil has won a tender for the construction and operation of a stretch of Mexico's Tuxpan-Tampico highway. The Tuxpan-Tampico highway links two of Mexico's busiest Gulf coast ports and will be the first project in the country to be developed under the public-private partnership (PPP) law's unsolicited proposal provision. The project involves the construction of a highway south of the city of Tuxpan, from the junction with the Tihuatlán-Tuxpan highway to the connection with the
  • Funding agreed for reconstruction of Fort Worth I-35W
    September 20, 2013
    A significant milestone in the redevelopment and expansion of Interstate 35W in Fort Worth, one of the most critical and most-congested corridors in the North Texas region and in the country has been achieved by NTE Mobility Partners Segments 3 LLC (NTEMP3). They have reached financial agreement on Segment 3A of the North Tarrant Express (NTE), paving the way for the reconstruction and expansion of the interstate. The project is being financed through a unique combination of public and private funds: US$
  • Fast moving walkways could move 7,000 people per hour
    November 28, 2016
    Researchers at the Swiss Federal Institute of Technology in Lausanne (EPFL) researchers have been studying futuristic transport solutions for car-free urban centres and have come up with an optimal design for a network of accelerating moving walkways. This is not a new concept – the first moving walkways were seen in Chicago in 1893 and seven years later they were used at the world’s fair in Paris. They are also regularly used the world over in airports and transport terminals. As part of the PostCarW
  • Details of new Dartford Crossing safety system unveiled
    January 21, 2015
    Since it launched on 30 November last year, Dart Charge has already helped to speed up journeys by removing the need to stop at a barrier to pay the Dartford Crossing charge. To get the most benefit from the changes, the UK Highways Agency has developed a new way of identifying and managing over-height vehicles and dangerous loads before they enter the tunnel, a job that until now was carried out at the payment barriers. All major tunnels have rules about what substances can be taken through them an