Skip to main content

London's new Silvertown Tunnel set to open

TfL says average peak journey times expected to be 20 minutes quicker
By Adam Hill January 13, 2025 Read time: 2 mins
Tunnel vision (© Hupeng | Dreamstime.com)

The new Silvertown Tunnel beneath the River Thames in the east of London, UK, is set to open on 7 April 2025.

The 1.4km-long twin-bore tunnel has two lanes per tunnel with dedicated lanes for heavy goods vehicles and buses. 

Indra has equipped the new structure with its In-Mova Traffic platform and intelligent transport systems including communication systems, radio communications network and traffic signals. 

Citilog has integrated its automatic incident detection system, which includes 59 CCTV cameras, to help reduce congestion in and around the tunnel. It provides real-time incident detection and response to enhance safety and incident management, and is designed to minimise false alarms while maintaining high detection accuracy.

Using thousands of video clips will help train an advanced network to reduce false positives, allowing operators to focus on genuine emergencies.

The new tunnel runs between the London borough of Greenwich, the peninsula area, and West Silvertown on the northern bank of the Thames.

Transport for London (TfL) says modelling shows it will help reduce congestion at the existing Blackwall Tunnel, with average journey times expected to be up to 20 minutes quicker at peak times.

It will also help manage overall air quality and allow for better cross-river public transport, TfL says, with new bus routes - free for the first year - meaning that bus crossings increase from six to 21 per hour.

While you will not be able to walk or cycle through the tunnel, a new zero-emission cycle-shuttle service is due to operate every 12 minutes, seven days a week.

Related Content

  • August 6, 2013
    Monitoring, detection and control systems inside tunnels can do much to improve traveller safety
    ITS technology can do a great deal to improve tunnel safety, as Colin Sowman discovers. It was back in April 2004 that the European Parliament adopted the EU Directive which lays down the Minimum Safety Requirements for Tunnels in the Trans-European Road Network (2004/54/EC). This was the first unitary legislation setting minimum safety standards for European road tunnels and was designed to harmonise the management of tunnel safety at a national level. Operators of existing tunnels have until 30 April 201
  • August 20, 2015
    New system to prevent Hazchem and over-height vehicles entering tunnel
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating
  • November 13, 2019
    Indra to manage traffic at seven tunnels in Colombia
    Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
  • July 6, 2022
    Thales joins Cairo metro pyramid scheme
    Company will provide communications and ticketing for line connecting Giza with Cairo