Skip to main content

Lighting upgrade for Mersey tunnel

Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
November 6, 2014 Read time: 2 mins
Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels.

The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fittings.

All the supply cables are original, as is the existing electrical service distribution and associated distribution panels and are therefore over 40 years old.

The improvements are needed to upgrade both the light fittings and wiring, which is aluminium as opposed to copper and is nearing the end of its design life. The existing electrical infrastructure was installed 40 years ago.

The cables run behind the cladding at road deck level, providing the potential for a single point of failure. In the event of a large fire or collision adjacent to the cladding, the cables would fail, resulting in loss of supply to all sections of the tunnel lighting. Currently, there is no emergency or back-up lighting in the tunnel.

The plan is to replace the lighting within the two Kingsway Tunnel bores with more efficient LED modules with a design life of 25 years. The new design will also include battery-backed emergency lighting throughout the length of the two tunnel bores.

Related Content

  • March 19, 2014
    Asking drivers what information they need: radical but effective
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv
  • December 4, 2018
    Tecsidel’s Pan-American Highway tunnel eases Lima’s traffic woes
    The Pan-American Highway connects the US and Canada with Latin America, running for thousands of miles from Alaska in the north to Argentina in the south. Mauro Nogarin finds that one tunnel built underneath it is now providing relief for thousands of travellers each day On the Pan-American Highway, the lengthy series of roads which spans both American continents - from the US state of Alaska to the Latin American country of Argentina - ITS solutions are many and varied. One of these, in Peru’s capital
  • August 5, 2013
    Travel times halve for tolling converts
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • May 27, 2014
    Activu and Mitsubishi give New Jersey controllers the big picture
    Mitsubishi and Activu team up to help New Jersey emergency centre with real-time situational awareness. Sandy was the largest Atlantic hurricane in recorded history, with winds spanning an area of 1,100 miles and damages estimated at $68 billion. It killed at least 286 people in seven countries, from Jamaica to the Jersey Shore. But tropical storms are not the only challenge for emergency operations up and down the East Coast.