Skip to main content

Lighting upgrade for Mersey tunnel

Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
November 6, 2014 Read time: 2 mins
Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels.

The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fittings.

All the supply cables are original, as is the existing electrical service distribution and associated distribution panels and are therefore over 40 years old.

The improvements are needed to upgrade both the light fittings and wiring, which is aluminium as opposed to copper and is nearing the end of its design life. The existing electrical infrastructure was installed 40 years ago.

The cables run behind the cladding at road deck level, providing the potential for a single point of failure. In the event of a large fire or collision adjacent to the cladding, the cables would fail, resulting in loss of supply to all sections of the tunnel lighting. Currently, there is no emergency or back-up lighting in the tunnel.

The plan is to replace the lighting within the two Kingsway Tunnel bores with more efficient LED modules with a design life of 25 years. The new design will also include battery-backed emergency lighting throughout the length of the two tunnel bores.

Related Content

  • January 23, 2012
    Tunnel simulators vital for real world tunnel management
    Guillaume Ponsar, tunnel safety engineer with Egis Road Operation, writes about the advantages to be gained from the use of tunnel simulators. Major tunnel disasters over the last decade and more have shown how swiftly and badly a simple crash or fire may evolve should the wrong actions be taken by control room operators or traffic managers. Global safety issues and the reactions of operations staff have now become the principal concerns for Operations and Maintenance (O&M) service providers. As a result, n
  • October 10, 2018
    Just Zip it! Lindsay takes to the road
    Greater vehicle connectivity is going to have huge implications for traffic management. David Arminas climbed aboard a Lindsay Road Zipper to see what this might mean in future As vice president of barrier specialist QMB Canada, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost
  • February 1, 2012
    Free-flow upgrade to Holland's Westerschelde tunnel's toll system
    Unbroken service Technolution's Winifred Roggekamp and Dave Marples describe efforts to upgrade the Westerscheldetunnel's tolling system to give free-flow capability. Until 2003 the Flanders region of Zeeland, in the south-west of the Netherlands, was connected to the mainland only by ferry. The new Westerscheldetunnel, a 6.6km toll tunnel, improves communications with the region considerably, taking some 100km off the alternative road journey. In 2006 it was recognised that the toll plaza for the tunnel ne
  • May 18, 2012
    AMG transmission system used in Blackwall Tunnel refurbishment
    AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (PDS) is undertaking the task of supplying the tunnel systems for the project.