Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

Related Content

  • March 25, 2019
    Fluor and partners to build and operate LAX Automated People Mover
    Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president
  • February 6, 2020
    US braces itself for congestion pain
    Mary Scott Nabers, author of Inside the Infrastructure Revolution: A Roadmap for Building America, looks at how different US states are embracing the need for public transport investment
  • March 14, 2024
    Iteris wins $1m traffic SaaS contract in California
    Ventura County Transportation Commission will use product to improve regional mobility
  • June 1, 2015
    Fluor JV to build Texas expressway
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst