Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • LA metro line to be extended
    November 10, 2014
    The Skanska joint venture with Traylor Brothers, Inc. and J.F. Shea Construction has been awarded a design-build contract by the Los Angeles County Metropolitan Transportation Authority to extend the Los Angeles Metro Purple Line.
  • Louis Berger awarded Mumbai Metro Line four contract
    April 12, 2018
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
  • Pennsylvania and Georgia contract wins for Rekor Systems
    January 29, 2024
    Firm studies vehicle patterns in Philadelphia's Navy Yard and in Metro Atlanta
  • Texas toll road contract awarded
    March 2, 2015
    The Texas Transportation Commission has awarded a contract to the Blueridge Transportation Group for the the planning, construction, financing, operation and maintenance of an express toll road and additional infrastructures for the SH 288 toll lanes project in Harris County in Texas. The consortium includes Israel-based Shikun & Binui Holdings, together with an infrastructure contractor and a financial investor. The ten mile stretch of road will connect Harris County to Houston. The project includes constr