Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • US budget proposals seek recognise ITS benefits
    April 30, 2015
    President Obama’s latest budget brings some good news for the transportation and ITS sectors. President Obama’s proposed 2016 budget could see more progress on many of America’s ingrained transportation problems than has been achieved in some time and includes a six-year $478 billion surface transportation reauthorisation. That is, of course, provided it clears all of the administrative hurdles to become law.
  • WSP/Parsons Brinckerhoff designing segment of I-4 in Florida
    January 6, 2016
    As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the Florida Department of Transportation (FDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County. The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a tot
  • Bluetooth speed and travel data collection shows cost savings
    February 2, 2012
    Houston TranStar is using Bluetooth sensors to collect speed and travel data in a project which is already demonstrating significant cost savings
  • NSW commits major funds to roads and maritime in 2013-2014 state budget
    June 20, 2013
    The New South Wales (NSW) Government will invest US$4.7 billion to build and maintain critical road and maritime infrastructure across the state in the 2013-2014 state budget, providing for new roads infrastructure, maintenance and road safety. Roads minister Duncan Gay says this new infrastructure fund, Restart NSW, will support the WestConnex Motorway, WestConnex enabling works in the Port Botany and Sydney Airport Precinct, the Pacific and Princes highways, Bridges for the Bush, and addressing congestion