Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • WSP/Parsons Brinckerhoff to manage California HOV project
    October 28, 2016
    The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
  • How does transit prepare for the next pandemic?
    November 30, 2020
    Covid-19 has taught us that once-in-a-generation events do actually happen sometimes. But Ronald E. Boénau suggests that transport agencies can prepare for the next pandemic - without exactly preparing for it at all…
  • American Center for Mobility gets top ITSA award
    June 6, 2018
    The non-profit public-private partnership American Center for Mobility and the US-23 Flex Route project carried off the two top honours in the ITS America awards. “It’s an honour to get a top award from ITS America,” said Paul Algebra, university region engineer with the Michigan Department of Transportation (left) which is working with HNTB on the US-23 Flex Route. The project is Michigan’s first Active Traffic Management system that provides additional capacity during peak use hours. US-23 won in the tra
  • Looking forward to LA 2022
    December 9, 2021
    Next September, the 28th ITS World Congress will return to the US for the first time since 2014 – to Los Angeles, a city that embodies ‘Transformation by Transportation’