Skip to main content

WSP/Parsons Brinckerhoff to manage California HOV project

The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
October 28, 2016 Read time: 2 mins
The Contra Costa Transportation Authority in California, US, has awarded a contract to 8556 WSP | Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project.

The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound I-680 between Treat Boulevard and Rudgear Road. The existing southbound I-680 HOV lane will be converted to an express lane from Marina Vista to Treat Boulevard and operational improvements will be made to the southbound I-680 express lane between Rudgear Road and El Cerro Boulevard.

As construction manager, WSP/Parsons Brinckerhoff is responsible for a range of services including constructability review, bid management, survey and staking, inspection, schedule analysis, permit monitoring and reporting, quality assurance, material testing, submittal review, and claim and conflict resolution.

The project is scheduled to be completed in June 2020.

Related Content

  • February 25, 2015
    San Francisco plans express lane network across Bay Area
    Colin Sowman looks at plans to convert 240km (150 miles) of HOV/car pool lanes. While some authorities have debated the conversion of high occupancy vehicle lanes (HOV) into express or managed lanes allowing toll paying single-occupant vehicles to avoid congestion, San Francisco’s Bay Area Metropolitan Transportation Commission (MTC) has acted. It is converting 240km (150 miles) of HOV/car pool lanes to express lanes and last fall the MTC’s Bay Area Infrastructure Financing Authority selected TransCore to d
  • January 6, 2016
    WSP/Parsons Brinckerhoff designing segment of I-4 in Florida
    As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the Florida Department of Transportation (FDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County. The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a tot
  • July 29, 2016
    WSP/Parsons Brinckerhoff named general engineering consultant for US road extension
    The Washington State Department of Transportation (WSDOT) has awarded a contract to WSP/Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma. The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near
  • July 4, 2014
    Parsons Brinckerhoff to modernise Michigan freeway
    Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin