Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Mexico improves road safety with speed enforcement programme
    June 7, 2012
    A programme of road safety education and enforcement in the State of Jalisco in Mexico has reduced speed related fatalities by 40% in nine months Speed enforcement equipment will appear in greater number and visibility around the city of Guadalajara over coming months, as the Mexican State of Jalisco expands its road safety campaign. This comes hot on the heels of an initial programme of traffic speed education and enforcement in Guadalajara, which has yielded remarkable results, reducing speed related fata
  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut
  • USDOT awards infrastructure grants to 18 projects
    September 9, 2016
    US Transportation Secretary Anthony Foxx has announced 18 infrastructure projects across the country that will receive federal grants as part of the new FASTLANE program. The grants, totalling nearly US$800 million, will be combined with other funding from federal, state, local and private sources to support US$3.6 billion in infrastructure investment in 15 states and the District of Columbia.
  • Honolulu says 'aloha' to light rail system
    July 5, 2023
    Passengers on Hawaiian island can now ride on 11-mile section with more to come