Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Global mobility study: world on the move
    November 27, 2020
    ERF reviews impact of new mobility on road infrastructure in 20 countries pre-Covid
  • ITS America 2016 San Jose tours programme shows the present and future of ITS
    May 27, 2016
    The major theme of Thursday, June 16, at ITS America 2016 San Jose will be a series of tours that exemplify intelligent transportation at work today and with an eye to the future. The Interstate 80 Integrated Corridor Mobility Project Tour will take in one of the most complex integrated Active Traffic Management systems in the country. This tour includes a stop at the Caltrans TMC in Oakland for an overview of system operations
  • Rwanda's mobility plan in seven junctions
    June 16, 2025
    ITS improvements at just seven intersections could be the key to improving transportation in Rwanda’s capital, Kigali: Shem Oirere reports from East Africa
  • Carbon finance delivers critical support to mass transit schemes
    February 2, 2012
    David Crawford investigates carbon finance in transport. World Bank carbon finance grants are delivering critical support to major mass transit deployments in emerging and developing economies. Only recently operative in the transport sector, the Clean Development Mechanism (CDM, see panel) is designed to generate additional income streams and improve internal rates of return on projects funded from public- and private-sector sources.