Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • August 5, 2016
    Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system
    An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
  • August 29, 2023
    London's ultra-low emission zone expands to cover whole city
    Public health measure's £12.50 daily charge is criticised as money-making exercise
  • July 21, 2016
    Daimler launches its ‘bus of the future’
    Daimler’s Mercedes-Benz Future Bus made its first autonomous trip on a public road recently, when it was driven at speeds of up to 70 km/h on a section of a bus rapid transit route in Amsterdam in the Netherlands. The 20 kilometre route, which links Schiphol Airport with the town of Haarlem, provided a challenge for the bus, with its numerous bends, tunnels and traffic signals. Although a driver was on board for safety reasons, for the most part the bus met the challenge autonomously, stopping at bus sto
  • November 6, 2014
    Lighting upgrade for Mersey tunnel
    Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting