Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • March 4, 2025
    Manchester extends Metrolink tap and go to trams and buses
    UK city will soon have integrated payment in same way as capital London
  • April 20, 2012
    Hindhead Tunnel safety demonstration
    A full scale major incident emergency exercise has been carried out in the UK’s brand new Hindhead Tunnel on the A3 in Surrey. Located just to the south of London, the A3 route carries heavy traffic volumes and the existing road link has been a major bottleneck for capacity as well as proving a safety risk for the area. The new tunnel, due to open soon will relieve traffic jams in the area and boost capacity.
  • November 22, 2013
    Brisbane to build combined road/rail tunnel
    Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project. The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations. In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today deliver
  • June 17, 2016
    Brooklyn eyes Bogota’s BRT system
    David Crawford considers the increased interest in bus rapid transit and looks that the latest trends. Bus rapid transit (BRT) is gaining an increasingly high profile in the US public transport agenda, for two main reasons. One is the potential for ‘trains on wheels’ to save substantially on installation costs as compared with other modes such as underground metros or light-rail transit. Another, highlighted in the case of New York City, is the value of having a rapid surface-based alternative available whe