Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • August 12, 2013
    Norway to renovate 200 tunnels
    The Norwegian Public Roads Administration (Statens Vegvesen) has to renovate 200 tunnels before 1 April 2019 to meet European Union safety requirements for tunnels. Norway’s Tunnel Safety Regulations 2007 apply to tunnels on state roads that are more than 500 metres long, of which Norway has 253. Thirty of these were built after 2007 and comply with the regulations, while only around twenty tunnels built after 2007 have been renovated. The authority will present an action program for the 2014-2017 period
  • November 13, 2019
    Indra to manage traffic at seven tunnels in Colombia
    Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
  • March 2, 2012
    Traficon AID deployed on Busan-Geoje fixed link project
    Traficon, an exhibitor at this week’s 17th ITS World Congress in Busan, South Korea, has revealed that the company’s involvement with the city will continue long after the event closes.
  • June 6, 2017
    Hyperloop One unveils nine routes across Europe as part of its Global Challenge
    Executives from Hyperloop One joined European dignitaries and policymakers in Amsterdam, Holland today at its Vision for Europe summit to discuss transforming transportation across the continent with Hyperloop.