Skip to main content

GE Energy forges charger agreement with Coda Automotive

GE Energy Industrial Solutions has finalised an automotive original equipment manufacturer (OEM) agreement for the sale and distribution of the GE WattStation wall mount electric vehicle (EV) charging station with EV manufacturer, Coda Automotive.
March 23, 2012 Read time: 1 min
940 GE Energy Industrial Solutions has finalised an automotive original equipment manufacturer (OEM) agreement for the sale and distribution of the GE WattStation wall mount electric vehicle (EV) charging station with EV manufacturer, Coda Automotive.

TheWattSation, a fast, easy-to-use Level 2 EV charger, significantly decreases the time required to fully charge an electric vehicle compared with a Level 1 charger. The Coda five-passenger, mid-size sedan is equipped with a 36 kWh battery pack that enables a fully charged Coda to go up to 150 miles. The company provides a 10-year, 100,000-mile battery warranty and a US base price of $39,900.

“This milestone is another step in GE’s journey to lead the future of global electrification,” said Luis Ramírez, CEO of GE Energy Industrial Solutions. “As demand for the GE WattStation continues to exceed our expectations, bringing our products closer to the customer will help accelerate the adoption of electric vehicles.”

For more information on companies in this article

Related Content

  • Machine vision’s image of road management’s future
    June 11, 2015
    Q-Free’s Marco Sinnema looks at how the commoditisation of high-quality vision-based solutions is widening their application. Machine vision technology’s entry into the ITS/traffic management sector has followed a classic top-down path. This is unsurprising given the extremely demanding performance criteria which are the standard in its market of origin, manufacturing processing. Very high image qualities combined with frame rates often in the hundreds per second range resulted in vision systems with capabi
  • IP technology the route to efficient multi-agency control rooms
    February 1, 2012
    As IP-based technology makes its presence felt in the control room sector, it makes for greater economies of scale and also offers a migration path for many other traffic management technologies. So says Barco's Guy Van Wijmeersch. Efficient control room collaboration and decision-making is only possible if operators and decision-makers have easy and timely access to information. In many cases, that information also needs to be accessible to multiple users at the same time. This is certainly so in the case
  • Wabtec announces PTC contracts with Metra
    December 18, 2015
    Wabtec Corporation has signed contracts worth about US$45 million Metra and Parsons Transportation Group (PTG) to provide equipment and services for a Positive Train Control (PTC) system for the Northeast Illinois Regional Commuter Railroad Corporation (Metra). Metra operates commuter rail service in Chicago and its surrounding suburbs, serving more than 100 communities at 241 rail stations, with a fleet of 146 locomotives, 843 passenger cars and 185 electric-propelled cars. Under the contracts, Wa
  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv