Skip to main content

Wabtec announces PTC contracts with Metra

Wabtec Corporation has signed contracts worth about US$45 million Metra and Parsons Transportation Group (PTG) to provide equipment and services for a Positive Train Control (PTC) system for the Northeast Illinois Regional Commuter Railroad Corporation (Metra). Metra operates commuter rail service in Chicago and its surrounding suburbs, serving more than 100 communities at 241 rail stations, with a fleet of 146 locomotives, 843 passenger cars and 185 electric-propelled cars. Under the contracts, Wa
December 18, 2015 Read time: 2 mins
6079 Wabtec Corporation has signed contracts worth about US$45 million Metra and 4089 Parsons Transportation Group (PTG) to provide equipment and services for a Positive Train Control (PTC) system for the Northeast Illinois Regional Commuter Railroad Corporation (Metra).
 
Metra operates commuter rail service in Chicago and its surrounding suburbs, serving more than 100 communities at 241 rail stations, with a fleet of 146 locomotives, 843 passenger cars and 185 electric-propelled cars.
 
Under the contracts, Wabtec will provide interoperable electronic train management system (I-ETMS) equipment, including kits and replacement components.  In addition, Wabtec will provide its TMDS back office system, as well as track data, training and related services.  Metra’s PTC system will be fully interoperable with PTC systems being implemented by Class I railroads in the US.
 
Raymond T. Betler, Wabtec’s president and chief executive officer, said:  “We have worked with Metra for several years to develop and design their PTC program, and we are pleased to help in its implementation.  Wabtec continues to demonstrate a unique and industry-leading ability to assist customers in meeting their PTC requirements.”
 
Betler also commented on the recent passage of the U.S. transportation funding bill, a five-year bill now known as the Fixing America’s Surface Transportation (FAST) Act:  “The new bill includes several provisions that should be good for the U.S. transit industry and, therefore, for Wabtec.  For example, this is the first multi-year bill passed in a decade, and that means transit agencies should have a longer-term planning horizon for potential projects. In addition, the bill calls for a 10.2 percent funding increase in year one and further increases in future years.  When coupled with our strong backlog of transit projects around the world, the new bill is another reason to be optimistic about Wabtec’s long-term growth opportunities in the transit market.”

Related Content

  • April 3, 2014
    Alaska Railroad to get Wabtec PTC
    Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems. The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service. Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 loc
  • July 24, 2013
    San Diego rail line gets positive train control
    Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
  • December 17, 2013
    Wabtec scoops train control contract
    Rail technology provider Wabtec Corporation has signed a US$34 million contract with Sound Transit, a commuter railroad serving the Seattle region, to design, install, test and commission a positive train control (PTC) system. Sound Transit's commuter rail line covers 82 miles and carries nearlythree3 million passengers annually. Under the contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for sixteen locomotives and eighteen passenger
  • September 7, 2015
    Chicago’s Metra rail system implements PTC
    US systems integrator Parsons has been selected by Metra, Chicago’s commuter rail operator, to install positive train control (PTC) technology on its commuter rail trains. PTC, which is federally mandated, is high tech collision avoidance technology that monitors and controls train movements. It is intended to prevent train to train collisions, over-speed derailments, incursions into established work zones, and movement of trains through a main line switch left in an improper position. As prime contra