Skip to main content

Florida DOT project awarded Envision Platinum sustainable infrastructure rating

The I-4 Ultimate Improvement Project in central Florida has been awarded Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISI) for its sustainability efforts in the environmental, social and economic impact on the community and the 21-mile I-4 reconstruction project. I-4 Mobility Partners (I-4MP), the public-private partnership (P3) rebuilding Interstate 4 through Central Florida, received the award for its ongoing programs to minimise environmental impacts, while also fa
January 13, 2017 Read time: 2 mins
The I-4 Ultimate Improvement Project in central Florida has been awarded Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISI) for its sustainability efforts in the environmental, social and economic impact on the community and the 21-mile I-4 reconstruction project.

I-4 Mobility Partners (I-4MP), the public-private partnership (P3) rebuilding Interstate 4 through Central Florida, received the award for its ongoing programs to minimise environmental impacts, while also facilitating the use of alternative transportation by integrating rail projects and improving pedestrian crossings and connections with bike trails.

The project involves the reconstruction of 21 miles of roadway infrastructure and is expected to transform the region by better connecting communities, improving the local economy and enhancing liveability for residents.

One of the most important benefits will be the improvement of traffic flow by easing congestion with the addition of four new variable toll express lanes and the reconstruction of 15 major interchanges, which includes widening 13 bridges, replacing 74 bridges and adding 53 new bridges, along with a pedestrian overpass and a pedestrian bridge. When complete, the project will provide a visually appealing signature corridor with bold landscaping, accent lighting, enhanced bridge architecture and other aesthetic features.

Related Content

  • March 22, 2012
    ODoT targets transportation funding solutions and alternatives
    Jerry Wray, Ohio Department of Transportation (ODoT) director, has officially announced the Division of Innovative Delivery, a move he says is critical to identifying innovative and alternative funding solutions and advancing the agency’s goal developing long-term, sustainable solutions to fund future transportation construction projects. By reducing agency costs, commercialising non-interstate rest areas and seeking sponsorship and naming rights for certain infrastructure projects, the Ohio Department of T
  • July 22, 2014
    Kapsch to provide AET for New York State Thruway
    Kapsch TrafficCom is to provide the New York State Thruway Authority with the development, installation and technical support for an all electronic tolling (AET) system. This new system eliminates the need for Thruway patrons to stop or slow down at tolling points. By enabling toll transactions to be completed at highway speeds, the AET system facilitates free-flowing traffic across multiple lanes to minimise congestion; the resulting reduction in vehicle emissions will have a direct, beneficial environm
  • April 30, 2015
    The UK’s busiest crossing adopts free flow charging
    Colin Sowman looks at the transition to free-flow charging on the Dartford Crossing, a notorious congestion blackspot on the UK motorway network. The Dartford Crossing, where London’s orbital M25 motorway crosses the lower reaches of the River Thames 32km (20 miles) to the east of Central London, has long been a major source of congestion. Now, to alleviate the congestion caused by some 50 million crossings per year, the Highways Agency has adopted a free-flow charging system - but the Crossing’s location a
  • March 30, 2017
    Connected citizens boosts Boston’s traffic management
    Data-derived traffic management is starting to show benefits as David Crawford discovers. The city of Boston has been facing growing congestion problems in its Seaport regeneration district, with the rate of commercial and residential growth threatening to overtake the capacity of the road network to respond.