Skip to main content

Florida DOT project awarded Envision Platinum sustainable infrastructure rating

The I-4 Ultimate Improvement Project in central Florida has been awarded Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISI) for its sustainability efforts in the environmental, social and economic impact on the community and the 21-mile I-4 reconstruction project. I-4 Mobility Partners (I-4MP), the public-private partnership (P3) rebuilding Interstate 4 through Central Florida, received the award for its ongoing programs to minimise environmental impacts, while also fa
January 13, 2017 Read time: 2 mins
The I-4 Ultimate Improvement Project in central Florida has been awarded Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISI) for its sustainability efforts in the environmental, social and economic impact on the community and the 21-mile I-4 reconstruction project.

I-4 Mobility Partners (I-4MP), the public-private partnership (P3) rebuilding Interstate 4 through Central Florida, received the award for its ongoing programs to minimise environmental impacts, while also facilitating the use of alternative transportation by integrating rail projects and improving pedestrian crossings and connections with bike trails.

The project involves the reconstruction of 21 miles of roadway infrastructure and is expected to transform the region by better connecting communities, improving the local economy and enhancing liveability for residents.

One of the most important benefits will be the improvement of traffic flow by easing congestion with the addition of four new variable toll express lanes and the reconstruction of 15 major interchanges, which includes widening 13 bridges, replacing 74 bridges and adding 53 new bridges, along with a pedestrian overpass and a pedestrian bridge. When complete, the project will provide a visually appealing signature corridor with bold landscaping, accent lighting, enhanced bridge architecture and other aesthetic features.

Related Content

  • June 6, 2025
    British Columbia's highway corridors show it’s good to share
    The Canadian province is advocating harmony along its major roads, setting aside major funding for projects to allow vehicles and other modes to operate safely side by side, reports David Arminas
  • May 30, 2014
    The Asia-Pacific poses a multitude of ITS challenges
    The Asia-Pacific ITS Forum and Exhibition in Auckland, New Zealand, provided a focus for the region’s ITS Associations. Mary Bell reports. In late April, ITS New Zealand hosted the 13th Asia-Pacific ITS Forum and Exhibition in Auckland. Around 350 delegates from 24 nations gathered to share and advance ITS applications on both strategic and technical levels and to discuss the differing and various challenges faced in the region.
  • April 28, 2016
    Fluor-led team selected for South Carolina port access road project
    Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston. The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Intersta
  • April 5, 2021
    LA confirms $133m transit contracts
    Sepulveda Transit Corridor Project includes rail and monorail solutions for busy road routes