Skip to main content

FCC consortium to build Colombia tunnel project

A consortium led by Spanish company FCC has been awarded a contract for the Toyo tunnel project, including design, construction, operation and maintenance of the tunnel in the Urabá Port, around 80 kilometres from Medellín, Colombia. The US$432 million project, which is expected to take ten years to complete, is located between the municipalities of Giraldo and Cañasgordas, around 500 kilometres north-west of Bogotá. It includes the building of a completely new road section, 41 kilometres long with one
November 2, 2015 Read time: 2 mins
A consortium led by Spanish company 5656 FCC has been awarded a contract for the Toyo tunnel project, including design, construction, operation and maintenance of the tunnel in the Urabá Port, around 80 kilometres from Medellín, Colombia.

The US$432 million project, which is expected to take ten years to complete, is located between the municipalities of Giraldo and Cañasgordas, around 500 kilometres north-west of Bogotá. It includes the building of a completely new road section, 41 kilometres long with one lane in each direction, as well as a dual carriageway section with two lanes in each direction through the mountains of western Antioquia.
 
The complete project also includes 12.3 kilometres of tunnels, 9.8 of which will make up the Toyo tunnel, added to the new road leading to Urabá. Once complete, this infrastructure will be the longest of its kind in Colombia.

The works are intended to substantially improve the connection between Medellín and the region of Urabá; once the whole Toyo tunnel project is complete, the journey between the capital of Antioquia and Urabá will be cut from the six hours it currently takes to three and a half for private vehicles and around four hours for lorries. The Mar 1 and Mar 2 highways, forming part of the Autopistas de la Prosperidad programme, amongst other infrastructure in the region, will also contribute to this shorter journey time.

Related Content

  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • April 2, 2012
    Egis Projects-Sanef consortium sign second major ORT operations contract in Canada
    A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will
  • June 27, 2024
    Indra brings in Citilog for Silvertown Tunnel incident detection
    System will help reduce congestion in and around tunnel under River Thames in London
  • March 4, 2015
    Consortium to build Finnish motorway
    The Finnish Transport Agency has appointed a consortium of Meridiam Infrastructure and YIT Rakennus as the service provider which will build the E18 Hamina–Vaalimaa motorway in Finland on a public-private partnership (PPP) basis. Construction will commence in autumn 2015 and the entire motorway is estimated to be completed in 2018. The consortium will be responsible for financing of the project, as well as planning, construction and maintenance for a period of 20 years. The E18 Hamina–Vaalimaa project compr