Skip to main content

Evolt wins first Go Ultra Low City contract in Scotland

Swarco Group’s Evolt eMobility brand has been awarded a contract estimated at US$2.2 million (£1.8 million) by Dundee City Council for the first phase of works to support three new charging ‘hubs’ in the city, along with an additional regional charging infrastructure. As one of the Go Ultra Low Cities, Dundee is creating three new charging hubs that will become dedicated areas for the charging of electric vehicles. Each hub will be equipped with Evolt’s well proven charging technology, including a combi
November 16, 2016 Read time: 2 mins
129 Swarco Group’s Evolt eMobility brand has been awarded a contract estimated at US$2.2 million (£1.8 million) by Dundee City Council for the first phase of works to support three new charging ‘hubs’ in the city, along with an additional regional charging infrastructure.

As one of the Go Ultra Low Cities, Dundee is creating three new charging hubs that will become dedicated areas for the charging of electric vehicles. Each hub will be equipped with Evolt’s well proven charging technology, including a combination of Rapid and Fast charging units that can charge two EVs simultaneously to 80% battery life within 30 minutes and an hour respectively.

Each hub will have solar panels installed to feed Evolt’s energy storage solution, which harnesses the power of second life EV and hybrid battery packs. Storing energy for future use reduces the heavy demand placed on the power grid when EVs are charging simultaneously.

A further four Rapid chargers and 14 Fast chargers will be installed at additional locations outside of the City centre to provide a wide network that supports existing EV users and to encourage further take up. All of Evolt’s units will be connected to the national ChargePace Scotland network.

Among the 14 Rapid chargers delivered, Dundee has chosen six of Evolt’s next generation Raption 50 model that includes a 47-inch LCD screen to offer the council a further revenue generating opportunity.

Related Content

  • February 5, 2016
    Connected Energy and Renault to collaborate on EV charging technology
    Renault and Connected Energy are partnering to develop sustainable and efficient ways of using electric vehicle batteries at the end of their useable in-vehicle life in order to supply innovative and more affordable electric vehicle (EV) charging solutions. At the end of their useful in-vehicle life, Renault EV batteries still have considerable remaining capacity, which means that they can continue to give great service in other applications before they are ultimately recycled. Through its E-STOR te
  • April 20, 2012
    The afterlife of spent electric vehicle batteries
    Earlier this year, General Motors signed a definitive agreement with ABB Group to identify joint research and development projects that would reuse Chevrolet Volt battery systems, which will have up to 70 per cent of life remaining after their automotive use is exhausted. Recent research conducted by GM predicts that secondary use of 33 Volt batteries will have enough storage capacity to power up to 50 homes for about four hours during a power cut.
  • February 12, 2019
    UK government pledges £6m on chargepoints for ultra-low emission taxis
    The UK government is investing more than £6 million in the deployment of chargepoints to support ultra-low emission taxis across the country. The money will be used to install nearly 300 rapid points and 46 fast ones in 17 local authorities, including Greater Manchester, Brighton & Hove and Leicester. Rapid chargepoints are typically able to charge an EV to 80% in 30 minutes depending on the model’s battery capacity while fast charging is expected to deliver more than 60 miles of range in 10-30 minu
  • March 13, 2014
    Aberdeen opts for APT EV charging
    Aberdeen City Council in Scotland has chosen electric vehicle (EV) charging from APT Technologies to support its aim to reduce air and noise pollution through encouraging the use of more sustainable and quieter transport modes. The contract also includes a three-year maintenance package. The first installation saw eight double 7kW units, two wall-mounted 7kW units and one double mixer post with 7kW and 3kW power supplies installed into local authority premises to service fleet vehicles and give council e