Skip to main content

Egis to operate and maintain Sydney’s WestConnex

Sydney Motorway Corporation (SMC), Australia, has awarded the contract for the operation and maintenance of WestConnex, Australia’s largest road infrastructure project, to Fulton Hogan Egis O&M (FHEO&M, a partnership of Egis Projects Asia Pacific and Fulton Hogan Construction. WestConnex, which is intended to significantly reduce travel times for commuters in the Sydney area is being delivered in three stages: Stage 1 (WestConnex M4) includes the widening of existing M4 motorway as well as a 5.5km tunne
January 12, 2016 Read time: 2 mins
Sydney Motorway Corporation (SMC), Australia, has awarded the contract for the operation and maintenance of WestConnex, Australia’s largest road infrastructure project, to Fulton Hogan Egis O&M (FHEO&M, a partnership of 533 Egis Projects Asia Pacific and Fulton Hogan Construction.
 
WestConnex, which is intended to significantly reduce travel times for commuters in the Sydney area is being delivered in three stages: Stage 1 (WestConnex M4) includes the widening of existing M4 motorway as well as a 5.5km tunnel extension; Stage 2 (WestConnex M5) includes a new 9km  road tunnel which will more than double capacity of the existing M5 East motorway corridor and provide a new  interchange, north of the city’s airport; Stage 3 (WestConnex M4-M5 Link) will link stages 1 and 2 via a new road tunnel, connecting the M4 and M5 corridors.
 
The contract term for stages 1 and 2 is 10 years. Operation and maintenance will start in 2019.
 
The contract also includes the operation and maintenance of the existing M5 East Motorway, previously operated and maintained by Egis as part of the BHEgis joint venture from 2001 to 2011. 

Related Content

  • March 16, 2017
    Canada looks to HOT lanes to tackle congestion
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • May 3, 2016
    Sydney to trial connected technology to reduce congestion
    Sydney, Australia is to trial connected technology in a bid to tackle congestion by reducing the number of times trucks stop at traffic signals. Minister for Roads Duncan Gay says the technology should improve travel time at more than 100 intersections across Sydney, resulting in smoother overall traffic flow for all road users.
  • May 3, 2017
    Metron consortium wins Sydney Metro design contract
    Metron, a consortium of Arcadis, Mott MacDonald, architecture house Foster + Partners, local architect Architectus and Robert Bird Group, has been awarded the underground station design and technical services contract as part of Stage 2 of the Sydney Metro project. With 31 stations and 66km of new metro rail, Sydney Metro is Australia's biggest public transport project. Stage 2 will include a 30 kilometre extension of metro rail under Sydney Harbour and through new CBD stations. Metron will lead the enginee
  • July 21, 2017
    Cycle safety improvements coming for Dunedin, New Zealand
    Work is set to start next month on a cycleway through central Dunedin, New Zealand, that aims to improve safety for cyclists, pedestrians and all road users. Fulton Hogan has been awarded a (US$6 million (NZ$8 million) contract to build new cycle lanes on the north and southbound streets of the State Highway 1 one-way system between the Dunedin Botanical Gardens and Queens Gardens. The work involves replacement of the existing painted cycle lanes, which sit directly next to busy traffic lanes and placing ne