Skip to main content

Consortium selected for Maryland LRT project

The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
March 3, 2016 Read time: 2 mins
The Purple Line Transit Partner consortium, comprising 2248 Fluor Enterprises, 7905 Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the 5629 Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA).

Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties.

The US$2 billion project will extend from Bethesda, Maryland in Montgomery County to New Carrollton, Maryland in Prince George’s County. This new line will provide connections to several existing transit providers and improve mobility to major economic and job centres, as well as the University of Maryland in College Park. The project is intended to support community revitalisation and transit-oriented development along the corridor.  

The Fluor-led design-build team, Purple Line Transit Constructors, comprises Fluor Enterprises, the Lane Construction Corporation and Traylor Bros and includes subcontractor 1677 Atkins North America as the lead designer. The team will begin design and construction later this year with passenger service scheduled for early 2022. Following construction, Purple Line Transit Operators, a Fluor-led team comprising Fluor Enterprises, Alternate Concept, and CAF USA will provide 30 years of operations and maintenance services.

For more information on companies in this article

Related Content

  • Italian consortium to build Naples-Bari high-speed railway
    March 2, 2017
    A consortium of Salini Impregilo and Astaldi has won a contract valued at US$418 million (€397 million) for the design and construction of the Naples to Cancello section of the Naples to Bari high-speed railway line in Italy, part of the Scandinavia to Mediterranean Corridor of the Trans-European Network (TEN).
  • New era of MAX transport for Perth
    August 19, 2013
    A joint venture of Parsons Brinckerhoff and Aecom has been selected by Western Australia’s Department of Transport (DoT) to form an integrated services team for the next phase of the 22 km Metro Area Express (MAX) light rail network. The JV is working with the DoT to develop a robust business case for the US$1.8 billion project that will change the face of Perth’s transport network. MAX project director for the DoT, David Thomas, said the project will introduce a new era of public transport to Perth. “MAX w
  • Latest round of TIGER funding announced
    August 1, 2016
    Nearly US$500 million will be made available for transportation projects across the US in the eighth round of the highly successful and competitive Transportation Investment Generating Economic Recovery (TIGER) grant program. Announcing the funding, US Transportation Secretary Anthony Foxx highlight how this will improve safety and economic opportunity in two US territories, 32 states and 40 communities across the country. This year’s TIGER awards include US$19 million to Pittsburgh, Pennsylvania fo
  • Go-ahead for Richmond-to-Raleigh high-speed rail proposal
    September 21, 2015
    The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing