Skip to main content

Consortium awarded LRT project in Canada

TransEd Partners, a consortium including global engineering and construction company Bechtel, has been selected by the City of Edmonton to finance, design, supply vehicles, build, operate, and maintain the first phase of the Edmonton Valley Line Light Rail Transit project. The Valley Line is central to the City of Edmonton's transportation plan, designed to meet the demands of Canada's second fastest-growing city that is expected to increase in size by 50 per cent by 2040.
February 12, 2016 Read time: 2 mins

TransEd Partners, a consortium including global engineering and construction company 8329 Bechtel, has been selected by the City of Edmonton to finance, design, supply vehicles, build, operate, and maintain the first phase of the Edmonton Valley Line Light Rail Transit project. The Valley Line is central to the City of Edmonton's transportation plan, designed to meet the demands of Canada's second fastest-growing city that is expected to increase in size by 50 per cent by 2040.  
 
The project will be delivered using a public-private partnership (P3) procurement model. Bechtel is the lead partner for the design and construction of the project. Bechtel also helped to secure financing and will assist in the provision of the operations and maintenance during the service period.
 
The multi-phased, 27-kilometre urban route will ultimately create 25 new stops and three stations for an estimated 100,000 daily commuters. The first phase of the Valley Line is a13.1-km section with 11 stops and  one two-storey station, which will run between Mill Woods and 102 Street, connecting commuters with the Capital Line and Metro Line at Churchill Station. Construction is due to start later this year.

Related Content

  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • May 10, 2018
    STV selected to design Massachusetts rail extension
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • March 12, 2014
    Doha Metro contract awarded
    A consortium led by Spain’s FCC and comprising Archirodon (Greece), Yüksel (Turkey) and Petroserv (Qatar) has announced that it has been awarded a US$700 million contract to build the Red Line, a section of Doha Metro. The contract includes building three elevated stations and a 6.97 kilometre section and the construction of a tunnel. The execution period is 31 months and the project will create more than 1,000 jobs, the consortium said. The metro is due for completion in 2019.
  • February 6, 2015
    Bogotá sets tentative timeline for metro tender
    Bogotá mayor Gustavo Petro has announced that a tender for the Colombian capital's Line No. 1 metro project, which has been in the planning for a decade, could be issued by July. However, the final timeline for bidding will depend on whether the city is first able to line up financing for the project, the mayor added, according to local press reports. Building the metro line is expected to cost US$7.5 billion, or about double the previous estimates. In its current form, the metro line will extend some