Skip to main content

Clearview Traffic shortlisted for two Highways Excellence Awards

Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects. In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the Highways Agency (HA) in 2007 to remove a major source of congestion a
September 28, 2012 Read time: 2 mins
557 Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects.

In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the 503 Highways Agency (HA) in 2007 to remove a major source of congestion around the A3/A287 junction.

According to Clearview, the hardwired road studs not only provide superior lane delineation with all the safety benefits, but also facilitate dynamic lane marking, allowing for normal running through each bore or a contraflow situation when one bore is closed.  Under normal running every other stud, therefore every 9m, is illuminated facing the oncoming traffic, whilst during contra flow arrangements every stud is illuminated in each direction at 4.5m intervals as a ‘do not cross’  instruction. This has given the operators the flexibility they require to maximise the safe and smooth continuous flow on this critical arterial road under all operating conditions.

The company has also been shortlisted jointly with Jacobs and Telford & Wrekin Council in the Road Safety Scheme or Project of the Year, for the A41 Chetwynd road safety scheme, which aims to decrease the number of collisions and reduce speeding drivers on this hazardous section of road.

The scheme runs along a dangerous stretch of the A41 in Chetwynd and is said to be a first in the UK, using both 1875 Astucia SolarLite and IRS1 hardwired intelligent road studs together with vehicle activated signs (VAS). During the hours of darkness the junction layout is defined using the road studs, delineating the road layout and shape also highlighting the turning lanes. Approaching vehicles travelling in excess of a predetermined trigger speed illuminate the VAS and the road studs increase in brightness to further highlight the junction layout and promote speed reduction.

The awards will be announced in London at a special awards dinner on Thursday 11th October 2012.

Related Content

  • August 17, 2016
    Jacobs wins further contract for Highways England’s roads investment program
    Jacobs Engineering Group has been appointed by Highways England to develop preferred options for multiple highways schemes planned in the east, south-east and north-west regions of England. Jacobs is providing engineering design services for civil engineering works and traffic technology, surveys, stakeholder engagement, environmental services, traffic modelling, building information modelling and principal designer services under the Construction (Design and Management) 2015 regulations. The stage t
  • March 29, 2022
    Sernis sees through the fog
    Fog can reduce drivers’ visibility to nearly nothing. However, if the Sernis SR-SDSFog system, nominated for an Intertraffic Green Globe Award, is activated in foggy situations, it uses LEDs for guidance and also to warn of the presence of another vehicle in front.
  • November 10, 2014
    M25 upgraded to ‘smart’ motorway
    Road users on the vast majority of the UK’s M25 will benefit from four-lane capacity now that the final section between junctions 25 and 27 has become a smart motorway. The road has been upgraded from three to four lanes in each direction, with the hard shoulder converted for use as a permanent traffic lane and enhanced on-road technology to manage traffic flow to improve the reliability of journey times, providing a boost for businesses and the wider economy.
  • November 1, 2013
    California’s new tunnel has safety features inspired by deadly fire
    A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.