Skip to main content

Chile plans feasibility studies to extend three metro lines

Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
March 14, 2014 Read time: 2 mins
Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago.

The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo.

The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the city, he added.

Metro de Santiago is currently building the 22 kilometre-long line 3, which will have 18 stations between Ñuñoa in eastern Santiago and Huechuraba in the north of the city and is budgeted at US$1.72 billion. The line will pass through six municipalities and serve some 660,000 residents.

Metro is also building line 6, a US$1.06 billion project that will run 15.3 kilometre from Providencia to Cerrillos in the west and have 10 stations. It will pass through eight municipalities and serve 870,000 residents.

Former president Sebastián Piñera's administration launched a master plan to invest US$22.5 billion in transport infrastructure in Santiago until 2025, with emphasis on metro, rail and roads. The plan includes investments of US$10.9 billion in metro and rail projects over the next 11 years, when the number of urban residents is expected to have risen by 11 per cent to 7.3 million and the number of cars to double to 2.65 million.

Related Content

  • Driverless trains begin operation on Milan Metro line 5
    May 7, 2015
    Driverless vehicles have begun operation on the Milan Metro line 5 extension which opened on the 29 April. Ansaldo STS delivered 19 trains to Milan Metro operator ATM, which will run on the extended 12.8 kilometre line to San Siro Stadio and will stop at five newly opened stations. A further five stations will be opened in October this year. The system allows remote supervision of daily train traffic and is able to change the frequency of trains to meet the fluctuating demands of daily traffic, ad
  • Bytemark offers mobility rewards programme
    October 22, 2021
    The programme supports the SDoT's 'Flip Your Trip' campaign
  • Vancouver’s SkyTrain Evergreen extension now in service
    December 9, 2016
    Metro Vancouver's regional transportation authority, TransLink, has inaugurated the SkyTrain Evergreen extension to the Millennium line, a significant expansion of the city’s integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network and West Coast Express. The SkyTrain line was first inaugurated in December 1985, utilising Thales’ communication-based train control system, SelTrac. Today, SelTrac rail signalling equips 100 per cent of the SkyTrain
  • Pöyry extends rail network maintenance management contract in Eastern Finland
    October 16, 2012
    The urban business group of Finnish consulting and engineering company Pöyry has been awarded a contract from the Finnish Transport Agency for maintenance management of the 1,800 kilometre-long Eastern Finland railway network, which the company has been managing since 2005. The new contract, valued at around US$6.7 million (EUR 5.2 million) commences at the beginning of 2013 and will run for five years. The contract covers the maintenance management of railways, rail structures and equipment, land areas and