Skip to main content

Canada invests in Vancouver’s EV charging infrastructure

The government of Canada is investing CAN$300,000 in the construction of six electric vehicle (EV) fast chargers in Vancouver. This funding is part of the government’s CAN$182.5m investment to develop a fast-charging network for EVs and establish natural gas stations along roads and hydrogen stations in metropolitan areas. The chargers are partially funded through the Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative, a programme which falls under Canada’s $180 billion Inves
February 15, 2019 Read time: 2 mins
The government of Canada is investing CAN$300,000 in the construction of six electric vehicle (EV) fast chargers in Vancouver.


This funding is part of the government’s CAN$182.5m investment to develop a fast-charging network for EVs and establish natural gas stations along roads and hydrogen stations in metropolitan areas.

The chargers are partially funded through the Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative, a programme which falls under Canada’s $180 billion Investing in Canada infrastructure plan. Additionally, the government of British Columbia provided a CAN$150,000 grant.

Kennedy Stewart, mayor of the city of Vancouver, says: “This funding to increase Vancouver’s fast chargers, which can provide up to 200km of range in an hour, is a boost to our public charging infrastructure.”

Pamela Goldsmith-Jones, member of parliament for West Vancouver–Sunshine Coast-Sea to Sky Country, says the government is working with municipal and provincial governments to support green infrastructure projects to encourage widespread adoption.

The chargers, built by the City of Vancouver, are expected to open in early 2020. Two fast chargers will be located at National Avenue, two at West 12th Street and two more at Pacific Boulevard.

Last year, the Canadian government invested CAN$1.2m in a %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external project false http://www.itsinternational.com/sections/transmart/news/canadian-government-invests-in-electric-bus-infrastructure/ false false%> led by the South Coast British Columbia Transportation Authority to install charging stations for electric buses in Vancouver.

Related Content

  • Rapidly-changing mobility environment is challenging policymakers, says UK DfT
    January 25, 2019
    Policy makers are working hard to make sense of a rapidly-changing mobility environment, according to a senior official from the UK’s Department for Transport (DfT). Ella Taylor, DfT’s head, future of mobility, Centre for Connected and Autonomous Vehicles (C/AV), says the pace of development in transportation modes, such as e-scooters (not currently allowed in the UK) and e-bikes (which are), presents difficulties for governments trying to create standards and laws. “Across the globe, different modes
  • Funding for SMEs and citizens to solve urban challenges using technology
    June 16, 2017
    Future Cities Catapult has announced a US$1.2 million (€1 million) ‘OrganiCity’ Open Call to solve city challenges in London, Aarhus, and Santander using urban data.
  • USDOT launches EAR workshop on vehicle noise
    August 2, 2013
    The Federal Highway Administration (FHWA) is to convene a two-day n Exploratory Advanced Research (EAR) Program workshop on the use of vehicle noise for roadway, bridge, and infrastructure monitoring. To be held at FHWA's Turner-Fairbank Highway Research Center in McLean, Virginia from 12:30 pm on 20n August to 12:30 pm on 21 August 2013, the workshop will provide participants from academia, the private sector, and government with an opportunity to discuss recent research and methodologies for measuring int
  • Bounce back with Berry’s spring steel buffer
    March 21, 2018
    Oops! Another small knock to your car in the car park. But thanks to the new spring steel buffer from Berry, it is the barrier that yields this time and not your vehicle’s bodywork. A key feature of the buffer is its deflection – typically around 300mm, according to Berry, part of the Hill & Smith group. This means that impact forces are absorbed by the buffers rather than transmitted directly to the mounting bolts or towards deformation of the railing system. They usually require one or two 20mm bolts.