Skip to main content

California aims to generate electric power from traffic congestion

California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power. One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is
April 20, 2017 Read time: 2 mins
California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The 4259 California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power.


One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is hoped they will convert the force of passing cars into a small electrical charge.

The resulting electricity could be used to power nearby lights and signs, stored in batteries or sent to the grid, Sun said. The more traffic there is, and the heavier the vehicles are, the more power can be created. Some state estimates suggest that just 400 cars an hour would need to pass over the arrays to make them economically viable.

The second experiment will be built by the San Jose green technology company Pyro-E. The company's technology is expected to generate enough power to supply 5,000 homes using less than a half-mile of piezoelectric highway.

Both pilot programs are expected, within two to three years, to be able to give California officials an idea whether the effort should be expanded. By developing new technologies like piezoelectricity, the Energy Commission is looking to help meet the Legislature’s target of producing 50 per cent of the state’s power from renewable sources by 2030.

Related Content

  • October 2, 2012
    IBM and ESB partner to deliver electric vehicle charging for Ireland
    IBM and Ireland’s Electricity Supply Board (ESB) are set to work together to deploy more integrated charging IT system for electric vehicles in Ireland. With 1,000 such public charging points now installed around the country, drivers will also be able to access all charging stations using an ID card. ESB Networks, which is currently rolling out the public charge points around Ireland, will be using IBM's Intelligent Electric Vehicle Enablement Platform to operate and manage these charge points. Apparently,
  • April 16, 2012
    Nissan Leaf will power homes
    Nissan Motor Company has unveiled a system which enables electricity to be supplied from the lithium-ion batteries installed in Nissan Leaf to ordinary households, as part of its comprehensive efforts toward the realisation of a zero-emission society. The new system was unveiled at a house built in front of the Nissan global headquarters by Sekisui House Ltd.
  • January 9, 2018
    Smarter transport remains key to smart cities
    Colin Sowman looks at some of the challenges and solutions that will provide enhanced transport efficiency in tomorrow’s smarter cities. However you define a ‘smart city’, one of the key ingredients will be an efficient transport system. As most governments and city authorities face financial constraints, incremental improvements in the existing systems is the most likely way forward. In London, new trains and signalling are improving the capacity of the Underground but that then reveals previously
  • October 20, 2014
    California's high-speed-rail project goes ahead
    The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead. Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project. The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to bui