Skip to main content

Brazilian PPP metro contract signed

Brazilian highway and metro concessionaire CCR has signed a US$1.85 billion contract for a public-private partnership (PPP) to carry out phase II work on Bahia state capital Salvador's metro system in northeast Brazil. The PPP involves building a total of 33.4 kilometres of metro lines and 19 stations and includes building an extension to the metro's existing 6.6 kilometre line 1 and preparing a project to extend the line some a further 3.6 kilometres.
October 22, 2013 Read time: 1 min
Brazilian highway and metro concessionaire CCR has signed a US$1.85 billion contract for a public-private partnership (PPP) to carry out phase II work on Bahia state capital Salvador's metro system in northeast Brazil.

The PPP involves building a total of 33.4 kilometres of metro lines and 19 stations and includes building an extension to the metro's existing 6.6 kilometre line 1 and preparing a project to extend the line some a further 3.6 kilometres.

A second metro line running will also be built which will connect with federal highway BR-324 and Salvador port. Once construction is complete, the concessionaire will operate both lines, which will have a total of 22 stations.

Construction is expected to take 42 months and the operational agreement is expected to be for about 27 years.

Related Content

  • Puerto Rico deals
    April 19, 2012
    The authorities in Puerto Rico awarded a contract to a consortium for two toll roads under a 40 year deal. The joint venture partnership comprises Spanish firm Abertis and Goldman Sachs' GS Global Infrastructure Partners II. The deal concerns the 83km PR22 road and the 8km PR5 road. The PR22 link is a major route with up to 10 lanes at its widest point while the urban PR5 road runs from PR22 to the western suburbs of San Juan.
  • Brazil state advances LRT project
    December 8, 2014
    Plans for a US$427 million light rail transit (LRT) system in Brazil's Minas Gerais state are moving forward. The project, for Uberlândia city, is being spearheaded by Uberlândia federal university (UFU) and the local authorities. A draft proposal was presented to the public this week for feedback and the university is now working on a basic engineering plan. City hall and the federal government would seek funding for the construction of the project. The LRT will have two lines, one spanning 6.9 kilom
  • South Korea company wins contracts in Nepal
    March 23, 2012
    The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal.
  • Asecap debates the future of tolling
    August 23, 2016
    Colin Sowman reports form Asecap’s Study & Information Days event in Madrid. At Asecap’s (the Association of European Toll Road Operators) recent Study and Information Days event there was no doubt about the subject at the top of the agenda: the European Union Directive 23/2014/EU. This will introduce fundamental changes to the concession model under which Asecap members operate more than 50,000km of tolled highways and, in response, it has compiled a report entitled Proposal for a Sustainable Concession Mo