Skip to main content

Brazil draws up transport concession timetable

Brazil's federal government has drawn up a tender launch schedule for highway, railway, airport, waterway, and port dredging concessions. Feasibility studies for the country's upcoming concessions have already been completed and tenders are due to be launched in the fourth quarter, local paper Valor Econômico reported. To date, a total of 493 kilometres of sections of federal highway, from Paraná state's Lapa city to Santa Catarina state's Chapecó city, are waiting to be put out to tender. Additional highwa
March 19, 2015 Read time: 2 mins
Brazil's federal government has drawn up a tender launch schedule for highway, railway, airport, waterway, and port dredging concessions.

Feasibility studies for the country's upcoming concessions have already been completed and tenders are due to be launched in the fourth quarter, local paper Valor Econômico reported.

To date, a total of 493 kilometres of sections of federal highway, from Paraná state's Lapa city to Santa Catarina state's Chapecó city, are waiting to be put out to tender. Additional highway stretches will be announced from June, planning minister Nelson Barbosa has said.

Current concession holders are interested in expanding the country's railway network in exchange for extensions to their concession contracts. The federal government is planning to evaluate their proposals shortly. Although the government is considering launching a tender for the Centro-Oeste integration railway (Fico), it has received provisional interest only from foreign parties and is currently awaiting local investors to get involved.

President Dilma Rousseff has confirmed that airport concessions in the state capitals of Porto Alegre (Rio Grande do Sul state), Florianópolis (Santa Catarina) and Salvador (Bahia) would be put out to tender in parallel with the restructuring of national airport authority Infraero. After privatising the most lucrative airports, Infraero is experiencing financial problems.

Tenders are also expected for waterways, where priority will be given to the north of Brazil. The federal government is currently developing plans for the Tapajós, Madeira and Tocantins rivers, as well as the Mercosul waterway in the south.

Related Content

  • Joined-up thinking for future ITS
    May 8, 2015
    David Crawford looks at a US model which, for modest federal funding, is producing substantive results. Outward and upward is the clear message emerging from the US$458,000, 2015 workplan of the US government’s ENTERPRISE (Evaluating New TEchnologies for Roads PRogram Initiatives in Safety and Efficiency) joint funding scheme for ITS research.
  • Inland waterways can de-stress city roads
    March 17, 2016
    David Crawford looks at an under-utilised solution for city-centre deliveries. The use of rivers and canals for moving freight is a well-established mode in North Western Europe, where it can take advantage of an intensively developed network. In the Netherlands, 40% of the total volume of goods transported internally goes by water; the figure for Flanders (the neighbouring Dutch-speaking region of Belgium) is 11.5%.
  • NSW commits major funds to roads and maritime in 2013-2014 state budget
    June 20, 2013
    The New South Wales (NSW) Government will invest US$4.7 billion to build and maintain critical road and maritime infrastructure across the state in the 2013-2014 state budget, providing for new roads infrastructure, maintenance and road safety. Roads minister Duncan Gay says this new infrastructure fund, Restart NSW, will support the WestConnex Motorway, WestConnex enabling works in the Port Botany and Sydney Airport Precinct, the Pacific and Princes highways, Bridges for the Bush, and addressing congestion
  • Brazil launches BRT tender
    February 20, 2015
    The city of Sorocaba in Brazil's São Paulo state has called for bids to develop a 35 kilometre bus rapid transit (BRT) system in the city budgeted at US$47 million, according to a local government tender notice. The contract, which involves building, maintaining and operating the BRT along the city's north-south and east-west corridors for 20 years, is expected to benefit some 150,000-180,000 passengers. Studies for the project have been carried out by the Consor-Ellenco and KPMG-Proficenter consortiums. Ac