Skip to main content

Boost for EV charging in Canada

Canada's electric vehicle industry is about to receive a major boost with the announcement of an agreement between eCAMION, based in Toronto, Dallas-based Leclanché North America, part of Switzerland's Leclanché and SGEM based in Geneva, to develop and install a network of 34 fast-charging stations along the Trans-Canada Highway (TCH). The project, designed to encourage the adoption of electric vehicles (EVs) in Canada, is being partially funded Natural Resources Canada (NRCan) under the Canadian Energy Inn
July 24, 2017 Read time: 2 mins
Canada's electric vehicle industry is about to receive a major boost with the announcement of an agreement between eCAMION, based in Toronto, Dallas-based Leclanché North America, part of Switzerland's Leclanché and SGEM based in Geneva, to develop and install a network of 34 fast-charging stations along the Trans-Canada Highway (TCH).


The project, designed to encourage the adoption of electric vehicles (EVs) in Canada, is being partially funded Natural Resources Canada (NRCan) under the Canadian Energy Innovation Program, with investment support from eCAMION, Leclanché and SGEM.

eCAMION and Leclanché have formed a Toronto-based joint venture, FAST Charge to manage the project and further expand the implementation of EV charging systems across North America.

Current EV charging systems make it difficult for drivers to travel long distances, contributing to 'range anxiety' and is one of the biggest obstacles globally to EV adoption.

The new system being developed by FAST Charge consists of an energy storage system, using large-format lithium-ion batteries, along with multiple-outlet charging units that can be charge several EVs at once.  This architecture helps overcome the slow charge issue by acting as a buffer between the grid and the vehicle and allowing EVs to be charged rapidly from the advanced lithium ion batteries instead of directly but more slowly from the grid. This will enable faster charging at Level 3 and higher, allowing EV drivers to charge their vehicles in just 20 minutes.

In addition, each charging station can be connected to a renewable energy source such as solar or wind to facilitate 100-percent emission-free driving.

Greater adoption of EVs for inter-urban travel will reduce the use of carbon-intensive fuels for transportation, which currently generates nearly a quarter of Canada's greenhouse gas emissions. FAST Charge estimates that the installation of 102 charging units at 34 different locations will reduce emissions by an estimated 0.7 million tons over the first five years of operation.

The project is scheduled for completion by the first quarter of 2019.

Related Content

  • Peachtree Corners makes traffic updates public
    January 7, 2021
    Screens will generate traffic data as part of initiative with Georgia Institute of Technology
  • Robotic Research: harnessing AV potential
    June 10, 2021
    Robotic Research is leading in AV R&D, from work with the US Army to enabling the first automated BRT line in North America: Gordon Feller assesses what the company is doing
  • ASTC to operate e-bus service in India
    June 28, 2019
    The Assam State Transport Corporation (ASTC) is to deploy 15 electric buses in Guwahati, a city in north-east India. The project is part of the Indian government’s FAME (Faster Adoption and Manufacturing of Electric Vehicles) scheme. A report by Business Standard says each bus will carry up to 31 passengers along a 6.4km route between the neighbourhoods of Kachari and Kamakhya. ASTC will operate a second service along a 38km route from the Inter State Bus Terminal while also running another service in
  • VW scandal prompts emissions testing debate
    December 1, 2015
    In the wake of the VW scandal John Kendall looks at emissions testing on both sides of the Atlantic. Since the VW emissions story broke in September, emissions testing has come under greater scrutiny, and none more so than in Europe, where critics have long been highlighting the weaknesses of the testing system. Ironically, changes to the emissions testing process were already under review but the story has pushed it up the agenda.