Skip to main content

Bombardier’s Chinese JV wins people mover contract

Bombardier Transportation’s Chinese joint venture, CSR Puzhen Bombardier Transportation Systems has received a US$130 million order from the Shanghai Shentong Metro for a turnkey Bombardier Innovia APM 300 automated people mover (APM) system, including 44 Innovia APM 300 automated people mover vehicles. The new 6.6 km, dual-lane elevated, driverless Innovia APM 300 system with six stations will serve as an extension to the existing Shanghai Metro Line 8. It will connect the large residential district of
June 22, 2015 Read time: 1 min
513 Bombardier Transportation’s Chinese joint venture, CSR Puzhen Bombardier Transportation Systems has received a US$130 million order from the Shanghai Shentong Metro for a turnkey Bombardier Innovia APM 300 automated people mover (APM) system, including 44 Innovia APM 300 automated people mover vehicles.

The new 6.6 km, dual-lane elevated, driverless Innovia APM 300 system with six stations will serve as an extension to the existing Shanghai Metro Line 8. It will connect the large residential district of Pujiangzhen to the Line 8 interchange at the Shendu Highway Station. System opening is planned for December 2017.

The consortium will supply the electrical and mechanical works for the turnkey system, including 44 Innovia APM 300 vehicles, the Bombardier Cityflo 650 communications-based train control (CBTC) system as well as the operations control centre. The 44 vehicles will be manufactured in China, configured into 11 four-car trains and feature inter-car gangways.

For more information on companies in this article

Related Content

  • Oxa & Beep deliver AV services in Florida
    February 29, 2024
    Shuttles are part of Ultimate Urban Circulator Project which includes monorail expansion
  • Brazilian PPP metro contract signed
    October 22, 2013
    Brazilian highway and metro concessionaire CCR has signed a US$1.85 billion contract for a public-private partnership (PPP) to carry out phase II work on Bahia state capital Salvador's metro system in northeast Brazil. The PPP involves building a total of 33.4 kilometres of metro lines and 19 stations and includes building an extension to the metro's existing 6.6 kilometre line 1 and preparing a project to extend the line some a further 3.6 kilometres.
  • Fluor JV to build Texas expressway
    June 1, 2015
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • Thales to supply communications systems for Hyderabad Metro Rail
    December 11, 2012
    Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w