Skip to main content

Bombardier wins contracts for the first monorails in Thailand

Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines. Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equi
August 14, 2017 Read time: 2 mins
513 Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines.


Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equipped with Bombardier Cityflo 650 automatic train control technology for driverless operation. The contract with NBM comprises the new 34.5 km Khae Rai-MinBuri (Pink) Line to operate with 42 train sets, while, for EBM, the contract includes 30 train sets for the 30.4 km Lat Phrao-Samrong (Yellow) Line. The contracts also include project management, systems engineering and integration, testing and commissioning for the new trains and systems.

Operating in the city’s northern and eastern areas, the monorails will integrate with the existing transportation network and run at speeds up to 80 km/h with a maximum capacity of over 28,000 passengers per hour, per direction.

For more information on companies in this article

Related Content

  • Predicting the future for video camera systems
    March 12, 2012
    Jo Versavel, Managing Director of Traficon, talks about near-term trends in video camera systems. Jo Versavel starts by making one thing clear: long-term forecasts as to what the future holds for video-based traffic monitoring are to all intents and purposes meaningless. The state of the art is developing so fast that in reality it's impossible to say where we'll be in 10 years' time, says the Managing Director of Traficon. In his opinion making firm predictions even five years out is too ambitious, whereas
  • Weathering the elements: how weather affects the network
    July 29, 2013
    Weather-related problems can render cost-cutting counter productive, according to CommScope’s Philip Sorrells. When severe weather conditions make headlines every winter, motorists and travellers seem willing to accept the impact on the trains and roads and yet take for granted that the communications networks will continue uninterrupted. They often appear far more upset that the information system does not give them an update on road conditions, train services or bus arrival times than they are about the a
  • Heathrow’s Ultra Pod technology joins GATEway driverless car pilot
    January 29, 2016
    British companies Westfield Sportscars, Heathrow Enterprises and Oxbotica have joined the GATEway (Greenwich Automated Transport Environment) project in Greenwich and are currently developing driverless shuttles for operation in Greenwich in summer 2016. Using entirely British engineering and software capabilities, the new consortium members will be developing the existing UltraPods currently in service at Heathrow Airport into fully autonomous and electric passenger shuttles. Operating at Terminal 5 for ne
  • Skanska awarded Swedish Malar line project
    March 21, 2016
    Skanska has been awarded a contract worth about US$47.96 million by the Swedish Transport Administration for the expansion of Mälarbanan (Malar Line) between Spånga and Barkarby, north of Stockholm. The turnkey project includes the expansion of Mälarbanan from two to four tracks on a three-kilometre section as well as a new platform. Commuter trains will have two separate tracks, while other trains will pass freely on the two outer tracks. Construction start of preparatory work is planned for the su