Skip to main content

Bombardier to supply new propulsion technology to London Underground

Rail technology supplier Bombardier Transportation has been awarded a contract by London Underground to supply new motors and traction control equipment for its fleet of Central line trains. This contract, which includes ongoing maintenance support, will run until 2024 and is valued by Bombardier Transportation at approximately US$143.7 million (£112.1 million). Bombardier's re-traction project is part of London Underground's larger Central Line Improvement Programme (which aims to bring a number of pas
August 29, 2017 Read time: 2 mins

Rail technology supplier 513 Bombardier Transportation has been awarded a contract by London Underground to supply new motors and traction control equipment for its fleet of Central line trains. This contract, which includes ongoing maintenance support, will run until 2024 and is valued by Bombardier Transportation at approximately US$143.7 million (£112.1 million).

Bombardier's re-traction project is part of London Underground's larger Central Line Improvement Programme (which aims to bring a number of passenger-focussed improvements and is expected to reduce customer-affecting failures on the Central line fleet.

For the programme, Bombardier will replace the direct current (DC) traction motors on Central line trains with the latest MITRAC alternating current (AC) traction systems and MITRAC traction control equipment. The Central Line '92 tube stock are the last London Underground trains to use DC traction motors, and MITRAC will bring benefits by reducing energy consumption while improving fleet reliability and performance. In total, Bombardier will supply new motors and traction control equipment for 85 eight-car Central Line trains (680 cars in total).

Related Content

  • October 21, 2016
    Siemens to electrify metro line in Ecuador
    Siemens has been commissioned by the Acciona-Odebrecht construction consortium to electrify the entire Metro Line 1 in the Ecuador capital, Quito. Line 1 is intended to improve daily commuting in the city, since it will provide direct routes from north and south of the city into the downtown area and historical city centre. The line is scheduled to begin passenger service in summer 2019. The city's first metro line will run over 20 kilometres through the city and operate at an elevation of more than 2,80
  • July 28, 2014
    Perth, Australia to get Parkeon’s real time tracking bus tracking
    Ticketing technologies company Parkeon is playing a key role in a multi-million dollar public transport project in Perth that will provide real-time journey tracking for passengers, along with Australia’s first underground dynamic bus stand allocation system. The real time tracking system (RTTS) forms a significant part of the contract awarded by the Western Australia Public Transport Authority to Downer EDI Engineering Power. It is being delivered by Parkeon as part of its latest ticketing platform and
  • May 31, 2017
    Iteris awarded transit performance initiative project by San Francisco transit company
    Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
  • July 16, 2012
    Semi-autonomous hybrid vehicle trials show fuel, emission savings
    The Transport Research Laboratory has unveiled an innovative semi-autonomous vehicle prototype. It offers improves in environmental performance and safety but also displays some shortcomings. Mike Woof reports. The UK's Transport Research Laboratory (TRL) has been working on an innovative project to develop a prototype vehicle intended to reduce fuel consumption. Based on a Ford Escape hybrid model, TRL's Sentience vehicle uses a combination of mobile communications and mapping technologies to reduce fuel c