Skip to main content

Iteris awarded transit performance initiative project by San Francisco transit company

Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
May 31, 2017 Read time: 1 min
Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.


This contract continues 73 Iteris’ involvement on 274 AC Transit’s popular Line 97, which spans 12.5 miles along a number of major corridors in the San Francisco Bay Area.

The design phase of the project is under way with deployment anticipated in 2018. Transit signal priority helps to reduce delay and improve schedule reliability for transit operations. Currently the service time for this route is 134 minutes. Once the project improvements are fully deployed, a roundtrip travel time is expected to be reduced by as much as 15 per cent.

UTC

Related Content

  • March 15, 2012
    Traffic signal priority initiatives aid better bus travel
    David Crawford investigates traffic signal priority initiatives developing for better bus travel on the US Pacific Coast Transit patronage rises by an average of 35% along commuter corridors equipped with bus rapid transit (BRT) systems, according to the US Department of Transportation’s Federal Transit Administration (FTA). BRT as defined as bus transit enhanced with ITS systems for better services, is winning new passengers attracted by opportunity to avoid increasing fuel costs and traffic congestion.
  • October 12, 2020
    Iteris wins $6.9m contract in San Francisco
    Company is also to carry out traffic signal synchronisation project in Orange County 
  • January 27, 2012
    Rapid growth of bus rapid transit schemes on US Pacific coast
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al