Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Ferrovial consortium to build I-77 HOT lanes
    June 30, 2014
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • Phoenix rises to the Smart City challenge
    December 10, 2015
    Andrew Bardin Williams looks at the City of Phoenix where voters backed a $30bn plan to revamp its transportation network to cultivate a more connected community. According to a Land Use Institute study, half of all Americans and even more millennials (63%) would like to live in a place where they do not need to use a car very often. The City of Phoenix is putting in place plans to revamp its urban development and transportation policies to meet these changing quality of life perceptions.
  • NCDOT chooses PPP to improve I-77 traffic flow in Charlotte
    April 17, 2014
    North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En
  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an