Skip to main content

NCDOT chooses PPP to improve I-77 traffic flow in Charlotte

North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En
April 17, 2014 Read time: 2 mins
4775 North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions.
 
Following a required bidding process and pending final review 5428 Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. English and the lead design firm of 4736 Louis Berger Group.

The US$655 million project aims to improve traffic flow on a 26-mile stretch of one of the most congested highways in North Carolina, and will be the first public-private partnership (P3) contracted by NCDOT.

“Louis Berger is proud to be the lead designer for NCDOT’s first P3 endeavour,” said Mike Kirk, vice president for Louis Berger’s design-build practice. “The I-77 high-occupancy managed lanes will provide a cost-efficient solution that will improve travel time reliability along this important corridor.”

Construction is anticipated to begin as early as December of this year, with an expected completion date in mid-2018.

Related Content

  • June 30, 2014
    Ferrovial consortium to build I-77 HOT lanes
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • May 27, 2015
    Consortium wins US$648 million highway project
    I-77 Mobility Partners, a consortium led by Cintra Infraestructuras, a subsidiary of Ferrovial, has finalised a US$648 million contract with the North Carolina Department of Transportation. The group will design and construct 26 miles of toll lanes on Interstate 77 in North Carolina.
  • June 13, 2017
    Louis Berger and Egis JV to support US rail technology and design
    Louis Berger and Egis have formed an exclusive partnership to meet the project development and delivery needs for mass transit, rail and freight owners and operators in North America, offering experience of managing complex infrastructure projects in the US and abroad through design-bid-build, design-build, P3 and turnkey delivery.
  • December 12, 2016
    Meridiam consortium named preferred proposer for Virginia's transform 66 project
    A consortium of Meridiam, Cintra, Ferrovial Agroman US, Allan Myers VA, Janssen & Spaans Engineering, the Louis Berger Group and American Structurepoint has been named Preferred Proposer by the Commonwealth of Virginia for the State’s Transform 66 Project. I-66 Express Mobility Partners will design, build, finance, maintain and operate the I-66 Outside the Beltway project under the Public Private Partnership (P3) Transportation Act. The project is designed to relieve congestion, improve safety and provi