Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

Related Content

  • Qualcomm and Renault sign MoU on wireless EV charging technology
    July 25, 2012
    Qualcomm and Renault have announced a memorandum of understanding (MoU) for their intended cooperation on the London trial of Qualcomm Halo Wireless Electric Vehicle Charging (WEVC) technology, and their intent with respect to conducting preliminary studies of the integration of this technology into Renault vehicles.
  • Authorities switch on to all electric buses as costs tumble
    January 9, 2018
    Alan Dron looks at changes in bus propulsion as cities look to improve air quality and seek to reduce maintenance costs. Despite the ending of various incentives to adopt alternative fuels, the introduction of electric buses by US transit authorities is picking up speed as performance improves, costs drop and air quality considerations become increasingly significant. More US bus manufacturers are introducing zero-emission models and some recent contracts will see many more passengers getting their first
  • Largest solar highway project in the US opens to rest stop visitors
    August 24, 2012
    One year after breaking ground, the largest solar highway project in the US — a partnership between Portland General Electric and the Oregon Department of Transportation — is now open to visitors stopping to take a break from their travels along Interstate 5 in Oregon. Growing clean, renewable energy amongst farm fields of corn and cabbage, the Baldock Solar Station is a 1.75-megawatt solar array boasting nearly 7,000 solar panels across seven acres of the Baldock Safety Rest Area, located on Interstate 5 n
  • Greenlots and Volvo Trucks to install EV chargers in California
    November 15, 2018
    Technology company Greenlots has partnered with Volvo Trucks to implement an electric vehicle (EV) charging infrastructure for fleets operating out of warehouses in southern California. The project is part of a public-private partnership, in which the California Air Resources Board (CARB) awarded $44.8 million to the South Coast Air Quality Management District. The funded was used for Volvo’s Low Impact Green Heavy Transport Solutions (LIGHTS) project. As part of LIGHTS, Greenlots will equip warehouses