Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

Related Content

  • GE researchers developing at-home refuelling station for NG vehicles
    July 20, 2012
    In what could help fuel widespread adoption of natural gas-powered (NG) vehicles in the US and globally, GE researchers, in partnership with Chart Industries and scientists at the University of Missouri, have been awarded a programme through Advanced Research Projects Agency for Energy (ARPA-E) to develop an affordable at-home refuelling station that would meet ARPA-E’s target of $500 per station and reduce re-fuelling times from 5-8 hours to less than 1 hour. Natural gas prices are at an all-time low and t
  • EV charging will require increased investment in cyber security systems
    April 18, 2012
    The technology architecture associated with electric vehicle (EV) charging is continuing to evolve as utilities and other key players in the industry ecosystem identify business requirements and risks associated with adding significant new demands on the electrical grid. One of the most pressing challenges is related to securing financial transactions and end-to-end communications throughout the EV charging infrastructure, and a recent report from Pike Research indicates that these areas will be the focus o
  • Extended EV charging infrastructure launched
    September 12, 2013
    UK city Corby is aiming to be a leading edge business location, with the launch of an extended electric vehicle (EV) charging infrastructure. To complement the EV charge points already at Corby Station and the Corby Cube, charge points have been installed at a range of venues and businesses including the Holiday Inn, Adrenaline Alley and Corby Town Football Club. Corby now has one of the highest concentrations of charge points per head of population in the UK.
  • BMW Group selects AeroVironment for EV charging in major US cities
    May 16, 2012
    AeroVironment has announced that the BMW Group has selected it as the preferred provider of electric vehicle charging equipment, accessories and installation services supporting the introduction of the all-electric BMW ActiveE. This vehicle is the second phase of the BMW Group's electro-mobility development strategy and brings all-electric technology to a new class of luxury vehicles. ActiveE vehicles will be distributed in the major metropolitan markets of Boston, Los Angeles, New York City, San Diego, San