Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • China’s BYD wins European electric bus orders for Netherlands city
    June 7, 2012
    An island which is home to the Netherlands’ first National Park is about to launch Europe’s cleanest bus fleet. The city of Schiermonnikoog in the province of Friesland, Netherlands is nestled on this 16 km long island and is virtually car-free. While home to about 1000 residents, over 350,000 people visit the island every year and will now ride in six new, long-range, all-electric BYD buses set to launch on Schiermonnikoog early next year. In a European legal tender and open bid supported by four major bus
  • Kenya plans road toll tenders
    March 25, 2015
    Kenya plans to start tendering in May for toll-road contracts estimated by the government to be worth $2 billion to improve the efficiency of the East African nation’s biggest commercial routes, according to Bloomberg. The contracts will be in addition to the 45 deals worth about US$3.2 billion that the government will start awarding as early as next week, to double the nation’s paved-road network through an annuity program. The government is planning to introduce five toll projects covering about 800 kilom
  • Ramp metering delivers - again
    January 27, 2012
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to
  • Engie unveils CNG station to refuel buses in West Africa
    December 18, 2018
    Engie and its engineering subsidiary Tractebel have installed a compressed natural gas (CNG) station in Ivory Coast, a country in West Africa, to refuel 50 buses. The station has been built as part of the Ivorian government’s commitment to the Paris COP 21 agreement to reduce emissions. Engie’s CNG fuelling station is located at transport company Société des Transports Abidjanais’ (SOTRA) premises in Yopougon, a suburb within the city of Abidjan. Once fully commissioned, it is anticipated to have a