Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Interoperability facilitates mobility on Santiago’s toll roads
    August 10, 2016
    Drivers crossing Chile’s capital are benefitting from additional investment in ITS. Mauro Nogarin reports. Santiago de Chile is pioneering the development of concession-interoperable, multi-lane, free-flow urban highways. This road network crosses the city from north to south (Autopista Central), from east to west (Costanera Norte) and also includes the north-western (Vespucio Norte) and southern (Vespucio Sur) ring roads surrounding this metropolitan area of seven million people.
  • Tolling is a ‘powerful tool to maintain and manage an infrastructure network’
    August 15, 2017
    Officials have recently moved to scrap tolls on several highways for the first time in 40 years, bucking a national trend toward more tolls on mostly urban roadways to shift the costs of transportation to those who use the roads, writes Associated Press. A regional authority voted this week to eliminate tolls on the Cesar Chavez Border Highway in El Paso. On the same day, Dallas city council rejected plans to build a toll road along the Trinity River. The council's action appears to be the death knell for a
  • Michigan to develop electrified roadway
    October 1, 2021
    MDoT has released RfP to implement the pilot along a one-mile stretch of roadway 
  • Mileage based charging offers secure future for funding
    August 10, 2016
    HNTB’s Matthew Click sets out why a move to mileage-based pricing is inevitable. Infrastructure is the most neglected yet the most critical engine of our society, and our continued indifference could lead to a dystopian future. Our roads, bridges and highways have been largely passed by in the digital age—marginalised in an era when funding is limited and stewardship of physical assets has given way to our preoccupation with technological innovation and data—the stuff of the virtual realm.