Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • L-Charge EV charger receives $1.5m boost
    September 21, 2021
    L-Charge plans to develop a network in Paris, Berlin, New York, Amsterdam and London
  • Solar-powered traffic detection improves communication
    January 31, 2012
    Pete Goldin reports on a new wireless, solar-powered traffic detection system being used by Caltrans District 12. As more and more traffic data is necessary to satisfy the needs of traffic management centres and traveller information systems, and as traffic detection technology becomes more ubiquitous, transportation authorities are pressured to find more economical ways of expanding their detection systems. Caltrans District 12 is leading this push by deploying the latest detection system from Case Global
  • First electric car ferry goes into operation in Norway
    May 19, 2015
    The world’s first electrical car and passenger ferry powered by batteries has entered service in Norway. The unique solution is a result of a competition that Ministry of Transport and Communications and the Norwegian Public Roads Administration launched in 2010. The ferry only uses 150 kWh per route, which corresponds to three days use of electricity in a standard Norwegian household. Built in conjunction with shipbuilder Fjellstrand, Siemens installed the complete electric propulsion system and install
  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.