Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Europe will have over two million public charging points by 2017
    April 19, 2012
    A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging. “We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastruc
  • Houston TranStar wins 'Best of Texas' award
    April 25, 2012
    Houston TranStar has been awarded "Most Innovative Use of Technology" by the Centre for Digital Government, a national research and advisory institute on information technology policies and best practices in state and local government, for its cutting-edge Bluetooth-based travel time information system. The new deployment, extending north more than 200 miles along the I-45 North corridor to Dallas, gives TranStar the capability to monitor and manage traffic conditions on this major evacuation route.
  • ABB installs 15 fast chargers for electric vehicles, Iceland
    November 8, 2017
    ON Power, a part of Reykjavik Energy, has signed a contract with ABB for the delivery and installation of 15 Terra multi-standard DC chargers type 53 CJG at various points along Iceland’s main highway. It is part of a plan to expand an e-mobility strategy by increasing the availability of charging stations along central locations of the country’s national highway. The fast chargers can charge an electric vehicle (EV) between 15-30 minutes. It features touch screen displays and graphic visualization
  • Spanish city to test 200 EVs
    May 9, 2013
    The Spanish city of Malaga is to participate in the four-year Zem2All project to study the impact that the use of electric vehicles (EVs) have on the city. During the tests an in-depth study of the impact of EVs on the electricity grid will be carried out and the conditions for a widespread use of electric cars will be analysed. Researchers say results should provide information on the impact and management of e-mobility resources in cities of the future, ranging from the use of cars, charging infrastructur