Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Hyundai beats pending government mandate with throttle override
    May 3, 2012
    Hyundai in the US has announced that it is fitting brake pedal electronic throttle override capability on all models well before government mandates come into effect. The US government mandate for brake pedal throttle override capability, a component of FMVSS 124 (Accelerator Control Systems), has been under consideration by the National Highway Traffic Safety Administration (NHTSA). However, its final approval and subsequent timing have yet to be determined. Hyundai says its development teams have been les
  • Siemens EV charging ahead in Corby
    March 8, 2013
    Siemens is to provide the UK’s Electric Corby with its CP500A AC electric vehicle (EV) charging points at the first of ten locations in Corby, with a further eight locations being finalised. With the support of Corby Borough Council, the latest Siemens EV charging equipment will be installed over the coming weeks. According to Siemens, the network of Siemens EV charge points will help Corby strengthen its position as a leading edge location for ‘cleantech’ business investment, and bolster the wider Plugged
  • Bristol to test new green bus technology
    January 9, 2015
    The city of Bristol in the UK is to pilot the latest green technology for buses thanks to a US$1.5 million grant from the Government to coincide with the city’s year as European Green Capital. Baroness Kramer, minister of State for Transport, announced today that Bristol will receive funding to purchase a number of new hybrid buses which can switch from diesel to electric automatically in low emission zones. The grant from the green bus fund will be used to purchase a number of hybrid buses with geo-f
  • Johnson Controls targets US with battery plant for start-stop vehicle technology
    April 23, 2012
    Johnson Controls has announced plans to invest US$138.5 million to convert its battery plant near Toledo, Ohio, in the US, into an Absorbent Glass Mat (AGM) battery facility for Start-Stop and other high efficiency vehicles. Subject to final state and local incentives, the facility will be the company's first such plant in the United States.