Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Truck ban eases traffic congestion in Jakarta city
    April 20, 2012
    A pilot project which began last month and which saw trucks banned on toll roads in Jakarta city, Indonesia, has produced dramatic results. The ban helped to cut traffic congestion in the city by 40 per cent, while average speeds rose from 15-20 km/h before the ban to 60-80 km/h.
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.
  • IBM brings Smart Cities Initiative to São Paulo
    September 9, 2014
    IBM announced the opening of a new information control centre in São Paulo, Brazil, capturing, linking and unifying data from 19 TMCs across the state–an area that includes 4,000 miles of state highways serving a population of 20 million people in 271 cities.