Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Asecap: get ready to rethink everything you know
    November 15, 2022
    How can we make our infrastructure ready for new sustainability challenges? What kind of investments are needed? And who will finance them? Tolling association Asecap has some thoughts. Geoff Hadwick reports from Lisbon
  • Grant to fund commercialisation of PbC batteries for micro-hybrid vehicles
    May 25, 2012
    Axion Power International, the developer of advanced lead-¬carbon PbC batteries and energy storage systems, has been awarded a US$150,000 grant from the US Department of Energy (DoE) to fund a commercialisation plan for the use of its PbC batteries in a low-cost, high-efficiency dual battery architecture for micro-hybrid vehicles.
  • Jeddah juggles transport needs of residents, pilgrims and tourists
    December 22, 2015
    Mass pilgrimages, new tourists and a growing population lead Jeddah to seek some smart transport solutions as David Crawford finds out. Rationalising traffic movement and public transport in a major Middle Eastern business and tourist centre that is also a gateway for millions of religious pilgrims every year is the challenge for the 20-year Jeddah Strategic Plan and the Jeddah Public Transport Programme (JPTP) it spawned. The latter is costed at US$8bn.
  • $60m in grants from USDoT for V2X deployment
    June 27, 2024
    Arizona, Texas and Utah receive money to improved connectivity and transportation