Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • SFMTA orders more Siemens light rail cars
    June 17, 2015
    San Francisco's Municipal Transportation Agency (SFMTA) has ordered an additional 40 light rail cars from Siemens for its Muni transit system. Leveraging an option under the original 175 light rail vehicle order signed in September 2014, the 40 additional vehicles are part of the biggest Siemens order ever for light rail cars placed in the US. Siemens will deliver a newly-developed light rail car based on its Model S200 for the San Francisco order. The car is especially energy-efficient thanks to a light-we
  • M2M and partner consortium developing infrastructure for electric vehicle charging
    October 24, 2012
    Telekom Austria Group M2M and its partner consortium is working to develop a complete infrastructure for the charging of Electric Vehicles (EVs) which includes navigation, billing and authorisation, load management and balancing, and reservations (including reservation with payment in order to stop charging point blocking).
  • Keys to the Kingdom
    May 1, 2025
    Saudi Arabia is investing heavily in smart infrastructure projects. Zeina Nazer takes a look at them – from Riyadh Metro to the controversial ‘vertical urbanism’ of The Line
  • Idaho adds human dimension to winter savings
    September 23, 2014
    Idaho leverages the increased capability and reliability of its road weather sensor network to reduce costs and prevent accidents. Weather-related accidents can form a significant chunk of an authorities’ annual road casualty statistics. While authorities cannot control the weather, the technology exists to monitor the road conditions and react with warnings to motorists and the treatment of icy or snow-covered roads. However, with all capital expenditure now placed under the microscope of public scrutiny,