Skip to main content

ADB to fund Jaipur metro extension

The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
May 30, 2014 Read time: 2 mins
The 2128 Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018.

A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by July-August 2014.

The metro will provide connections to the entire central business district. The extended line is expected to carry 126,000 passengers every day during its first year of operation. The stations along the Line 1 will connect existing and planned bus routes to help travel to other parts of the city much faster.

Officials said the ADB's loan will also help finance studies into the planned 23 kilometre long north-south line 2. This study will be completed towards the end of 2015.

For more information on companies in this article

Related Content

  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • USDOT finances Ohio River Bridges East End Crossing
    April 17, 2015
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$162 million from the Department's Federal Highway Administration to finance the East End Crossing section of the Louisville-Southern Indiana Ohio River Bridges Project. At the total cost of US$1.27 billion, the East End Crossing includes the East End Bridge and its connecting roadways. The bridge spans the Ohio River eight miles to the north connecting the east end of Louis
  • Latin America projected to invest in metro systems
    April 22, 2014
    Latin American countries are expected to invest some US$40 billion in metro projects by 2025, according to a report from the Inter-American Development Bank (IDB). "In total, they will build or expand more than US$40bn in 20 projects," stated the report entitled Latin America and the Caribbean in 2025. The report, Latin America and the Caribbean 2015, indicates that some of the projects include construction of line 3 and line 6 in Chilean capital Santiago's subway, expansion of Brazil's São Paulo met
  • Vietnam launches smart highway, ETC systems
    March 26, 2015
    The Ho Chi Minh City-trung Luong highway connecting the city and the Mekong Delta province of Long An has become the first in Vietnam to be controlled by an intelligent transport system (ITS), says the Vietnam News Agency. The was implemented between April 2013 and December 2014 and was officially launched on 20 March, with a total investment of US$38.5 million, funded by preferential loans of the Republic of Korean Government and the Vietnamese Government budget. The system includes a smart control