Skip to main content

ADB to fund Jaipur metro extension

The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
May 30, 2014 Read time: 2 mins
The 2128 Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018.

A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by July-August 2014.

The metro will provide connections to the entire central business district. The extended line is expected to carry 126,000 passengers every day during its first year of operation. The stations along the Line 1 will connect existing and planned bus routes to help travel to other parts of the city much faster.

Officials said the ADB's loan will also help finance studies into the planned 23 kilometre long north-south line 2. This study will be completed towards the end of 2015.

For more information on companies in this article

Related Content

  • Authorities switch on to all electric buses as costs tumble
    January 9, 2018
    Alan Dron looks at changes in bus propulsion as cities look to improve air quality and seek to reduce maintenance costs. Despite the ending of various incentives to adopt alternative fuels, the introduction of electric buses by US transit authorities is picking up speed as performance improves, costs drop and air quality considerations become increasingly significant. More US bus manufacturers are introducing zero-emission models and some recent contracts will see many more passengers getting their first
  • NOCoE delivers data for diligent DOTs
    April 29, 2015
    David Crawford talks to Dennis Motiani about the role of the new National Operations Centre of Excellence. Consolidating the collective experience of the US transportation system’s management and operations (TSM&O) community, streamlining its information gathering, while cutting research times and costs are the key drivers behind the country’s new National Operations Centre of Excellence (NOCoE). Launched in January at the annual meeting of the Transportation Research Board (TRB), this sets out to be a sin
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i
  • Siemens to electrify metro lines in Peru
    January 25, 2016
    Siemens has been awarded a contract by Ansaldo STS to electrify the new double-track metro line 2 in Peru’s capital city, Lima, as well as the eight kilometre-long first phase of line 4 in the city. The two new metro lines will connect additional city districts and the international airport to the capital's mass transit network. The contract also includes the simultaneous extension of line 2 to the airport, the first phase of the future line 4. The project includes six feeder stations, two 20 kV cable